
The Digest:
Eko Electricity Distribution Company (EKEDC) has announced a planned 25-day blackout across parts of Lagos. The power outage will take place between July 28th and August 21st, 2025, from 8 AM to 5 PM daily for essential maintenance work by the Transmission Company of Nigeria (TCN).
Key Points:
- Eko Disco announces a 25-day blackout in parts of Lagos from July 28th to August 21st, 2025.
- The outage will occur daily from 8 AM to 5 PM due to maintenance on the Omotosho-Ikeja West 330 kV line.
- Areas affected will experience intermittent power supply and load shedding.
- The maintenance work is being carried out by the Transmission Company of Nigeria (TCN).
- Residents should expect power interruptions and should plan accordingly.
- The outage aims to enhance the efficiency and stability of the regional electricity grid.
Lagos residents should prepare for 25 days of power disruptions between July 28th and August 21st, as TCN conducts essential maintenance. Eko Disco has assured that power outages will primarily affect the daily period from 8 AM to 5 PM.
Sources: DailyPost